Case study 02 · 2023

Bukit Terrace House

Bukit Timah, Singapore · Renovation and Rear Extension · 312 sqm

The project

Design, tender and site oversight

A 1970s terrace house opened along its garden edge with a steel-and-glass rear elevation, a stone kitchen island and a panelled study that carries the formality of the original house.

The brief

Two professionals and one large family table. The house worked as a set of small rooms and failed as a place to host. The clients wanted the ground floor to read as one hospitality space while keeping a properly quiet study for evening work.

The move

A single-storey rear extension replaced the old service yard, glazed floor to ceiling in slim blackened steel. The kitchen was rebuilt around a four-metre mitred stone island, and the front reception room became a fully panelled study with concealed book storage.

Material and light

Grey-veined stone, smoked oak cabinetry, aged brass tapware and deep oxblood leather in the study. Daylight is pulled through the plan by a clerestory that runs the full width of the extension.

Delivery

Delivered in two phases so the family could remain in the upper floors throughout. Eighteen weeks on site, with a fixed scope of works agreed before demolition began.

Panelled study with oak joinery, marble chimneypiece and leather armchair
Stone-clad bathroom with monolithic bath and tall arched window
Material palette of limestone, lime plaster, white oak, brass and tan leather

Outcome

312

Square metres

18

Weeks on site

2

Phase delivery, occupied

4m

Mitred stone island

The extension does not feel bolted on. It feels like the house was always meant to end that way.

Private client, Bukit Timah

Project record

ScopeRear extension, kitchen, study joinery, guest bathroom
MaterialsGrey-veined stone, smoked oak, blackened steel, aged brass
JoineryIsland, panelled study, wardrobes, vanity
Duration18 weeks on site
StatusCompleted 2023